Pha Lai 2x300MW Thermal Power Plant No. 2
Scope of works:
- Supply of material, amendment of 6.6kV electric cables for barge unloader - D and stacker A.
- Installation and maitenance of HVAC for building system and control center.
- Maintenance of fire protection system and protection fire alarm for the factory.
DAIWA DEVELOPMEMT INVESTMEMT JOIN STOCK COMPANY Add: Villa 15/2, Hoang Liet Str., Hoang Mai Dist., Hanoi Tel: +84-24-3668 6390 Email: info@idw.com.vn; info@hbg.com.vn; |